waste-recycling-plant-thumb

Case Study – Waste Recycling Plant

waste-recycling-plantEMS Ltd were selected by Calder Valley Skip Hire in Sowerby Bridge Halifax to decommision an existing ineffiecient plant and install an improved plant to increase the processing capacity of the site.

This plant has been designed to utilise the waste ground to the rear of the waste transfer shed thus maximising space for tipping and stockpiling of sorted waste under cover.

Plant Includes:

  • Trommel screen-28ft long and 8ft diameter drum,
  • Multiple screen splits
  • fines cleaning Screen.
  • TWIN line picking station.
  • 2x 0verband magnets
  • 2x fan systems
  • Trommel screen-28ft long and 8ft diameter drum,
  • Multiple screen splits
  • fines cleaning Screen.
  • TWIN line picking station.
  • 2x 0verband magnets
  • 2x fan systems